News of 2013

GESTAMP SOLAR BEGINS TO OPERATE TWO SOLAR PHOTOVOLTAIC PLANTS IN PERU

Date: 
11/Mar/2013
Category: 
Corporacion Gestamp, Gestamp Solar

(Madrid, March the 8th,2013) Gestamp Solar, photovoltaic solar division of Gestamp Renewables, starts to operate two photovoltaic plants in Peru.

This Project is composed by two solar photovoltaic plants: one called “Tacna Solar” located in Tacna and the other one called  “Panamericana Solar” located in Moquegua, both in Peru. They have a total capacity of 40 megawatts (MW), 20...