Almansa
Installed Capacity: 50MW
Country: Spain
64,374{{tons CO₂/year}}
Tons of
CO2 avoided
CO2 avoided
99,039{{MWh/year}}
Annual production of 100% renewable energy
Country: Spain
Region: Albacete
Area: 125ha
Project status: Historic
Operation date: December 2019
System type: One Axis Tracker
Peak power: 49.95MWp
Nominal power: 43.89MWn
Annual production: 99,039{{MWh/year}}
Tons of CO₂ avoided (approx): 64,374{{tons CO₂/year}}
Households supplied (approx): 29,076