Talarrubias I
Installed Capacity: 43MW
Country: Spain
56,914{{tons CO₂/year}}
Tons of
CO2 avoided
CO2 avoided
87,561.50{{MWh/year}}
Annual production of 100% renewable energy
Country: Spain
Region: Badajoz
Area: 114ha
Project status: Historic
Operation date: December 2019
System type: One Axis Tracker
Peak power: 42.93MWp
Nominal power: 34.33MWn
Annual production: 87,561.50{{MWh/year}}
Tons of CO₂ avoided (approx): 56,914{{tons CO₂/year}}
Households supplied (approx): 25,706