Torre de Cotillas
Installed Capacity: 50MW
Country: Spain
66,053{{tons CO₂/year}}
Tons of
CO2 avoided
CO2 avoided
101,623{{MWh/year}}
Annual production of 100% renewable energy
Country: Spain
Region: Murcia
Area: 186.15ha
Project status: Historic
Operation date: December 2019
System type: One Axis Tracker
Peak power: 49.96MWp
Nominal power: 42.25MWn
Annual production: 101,623{{MWh/year}}
Tons of CO₂ avoided (approx): 66,053{{tons CO₂/year}}
Households supplied (approx): 29,834