Umm Gudair
Installed Capacity: 10.06MW
Country: Kuwait
11,440{{tons CO₂/year}}
Tons of
CO2 avoided
CO2 avoided
17,600{{MWh/year}}
Annual production of 100% renewable energy
Country: Kuwait
Region: Umm Gudair
Area: 37.60ha
Project status: Historic
Operation date: October 2016
System type: One Axis Tracker
Peak power: 10.06MWp
Nominal power: 10.06MWn
Annual production: 17,600{{MWh/year}}
Tons of CO₂ avoided (approx): 11,440{{tons CO₂/year}}
Households supplied (approx): 5,167